KITTY HAWK

Substation

North Carolina · VIRGINIA ELECTRIC & POWER CO

Max voltage
230
kV

KITTY HAWK is an electric transmission substation in North Carolina, operated by VIRGINIA ELECTRIC & POWER CO. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

OperatorVIRGINIA ELECTRIC & POWER CO
Coordinates36.1084, -75.7737

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7533230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE7.4 mi
#38764230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE37.0 mi
#56348230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE4.5 mi
#65036115 kVVIRGINIA ELECTRIC & POWER CO0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of KITTY HAWK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near KITTY HAWK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SUMMIT FARMS SOLARSubstation-AdjacentNCCamden County230 kV300 MW4.3 yrs66.6
SLIGOSubstation-AdjacentNCCamden County230 kV300 MW4.3 yrs65.5
TAP169671Substation-AdjacentNCCurrituck County230 kV300 MW4.3 yrs62.4
Greenfield (UNKNOWN111374 - SHAWBORO)GreenfieldNCCamden County230 kV300 MW4.3 yrs59.4
Greenfield (KITTY HAWK - SHAWBORO)GreenfieldNCCurrituck County230 kV300 MW4.3 yrs57.7
Greenfield (KITTY HAWK - SHAWBORO)GreenfieldNCCurrituck County230 kV300 MW4.3 yrs56.9
KITTY HAWKSubstation-AdjacentNCCurrituck County230 kV300 MW4.3 yrs56.5
Greenfield (FENTRESS - SLIGO)GreenfieldNCCamden County230 kV300 MW3.1 yrs56.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for KITTY HAWK substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.