HEARDMONT

Substation

North Carolina · GEORGIA POWER CO

Max voltage
115
kV

HEARDMONT is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates34.0537, -82.7314

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#24694115 kVGEORGIA POWER COIN SERVICE4.2 mi
#37990115 kVGEORGIA POWER COIN SERVICE7.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HEARDMONT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HEARDMONT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HARTWELL LAKESubstation-AdjacentGAHart County230 kV300 MW4.3 yrs67.9
UNKNOWN111251Substation-AdjacentGAHart County230 kV300 MW4.3 yrs67.8
TAP150472Substation-AdjacentGALincoln County115 kV100 MW3.7 yrs66.8
UNKNOWN112371Substation-AdjacentGAWilkes County115 kV100 MW3.7 yrs66.7
UNKNOWN110791Substation-AdjacentGAElbert County230 kV300 MW4.3 yrs65.8
UNKNOWN154648Substation-AdjacentGAHart County230 kV300 MW4.3 yrs65.5
UNKNOWN112375Substation-AdjacentGALincoln County115 kV100 MW3.7 yrs65.4
John S RaineyBrownfieldGAHart County530 MW3.7 yrs65.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HEARDMONT substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.