GOLDSBORO

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
115
kV

GOLDSBORO is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as sub-transmission (115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines5

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates35.3767, -77.9110

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#45149115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE12.5 mi
#57604115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE6.9 mi
#57922115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE4.1 mi
#57947115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE5.1 mi
#57948115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE5.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of GOLDSBORO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near GOLDSBORO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN113480Substation-AdjacentNCJohnston County230 kV300 MW4.3 yrs67.5
UNKNOWN112699Substation-AdjacentNCWayne County230 kV300 MW4.3 yrs64.4
UNKNOWN113509Substation-AdjacentNCJohnston County230 kV300 MW4.3 yrs64.4
UNKNOWN112758Substation-AdjacentNCSampson County115 kV100 MW4.3 yrs63.3
UNKNOWN112689Substation-AdjacentNCWilson County115 kV100 MW4.3 yrs63.3
UNKNOWN111469Substation-AdjacentNCGreene County230 kV300 MW4.3 yrs63.2
CLINTONSubstation-AdjacentNCSampson County230 kV300 MW4.3 yrs63.1
UNKNOWN148081Substation-AdjacentNCWayne County230 kV300 MW4.3 yrs62.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for GOLDSBORO substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.