GASTON

Substation

North Carolina

Max voltage
232
kV

GASTON is an electric transmission substation in North Carolina. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage232 kV
Min voltage232 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

Coordinates36.4988, -77.8114

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#64700232 kV0.0 mi
#64701232 kVIN SERVICE0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of GASTON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near GASTON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111421Substation-AdjacentVAGreensville County230 kV300 MW3.1 yrs70.4
Greenfield (CLOVER - UNKNOWN175464)GreenfieldVALunenburg County500 kV1,000 MW3.1 yrs69.0
Greenfield (CLOVER - UNKNOWN175464)GreenfieldVALunenburg County500 kV1,000 MW3.1 yrs68.6
Greenfield (WAKE - CARSON)GreenfieldVAGreensville County500 kV1,000 MW3.1 yrs68.4
CLUBHOUSESubstation-AdjacentVAEmporia city230 kV300 MW3.1 yrs68.2
BEECHWOOD DPSubstation-AdjacentVAMecklenburg County115 kV100 MW3.1 yrs68.1
SOUTH HILLSubstation-AdjacentVAMecklenburg County115 kV100 MW3.1 yrs67.9
ROSEMARY POWER STATIONSubstation-AdjacentNCHalifax County230 kV300 MW4.3 yrs67.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for GASTON substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.