G G ALLEN

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
100
kV

G G ALLEN is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as distribution (69–115 kv) and connects 14 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines14

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates35.1824, -81.0046

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7756100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE6.0 mi
#9941100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.1 mi
#20493100 kVDUKE ENERGY CAROLINAS, LLC0.2 mi
#20745100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.2 mi
#21991100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.2 mi
#22148100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE6.0 mi
#23097100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.2 mi
#29663100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.2 mi
#33446100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE12.2 mi
#37541100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.8 mi
#43493100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE5.7 mi
#57310100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE5.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of G G ALLEN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near G G ALLEN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MCGUIRESubstation-AdjacentNCMecklenburg County500 kV1,000 MW3.7 yrs81.1
Greenfield (UNKNOWN111199 - MCGUIRE)GreenfieldNCGaston County500 kV1,000 MW3.7 yrs73.5
Greenfield (UNKNOWN111199 - MCGUIRE)GreenfieldNCGaston County500 kV1,000 MW3.7 yrs73.0
UNKNOWN114573Substation-AdjacentNCCabarrus County230 kV300 MW4.3 yrs72.6
UNKNOWN114646Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs72.4
WOODLAWNSubstation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs72.3
TAP169820Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs71.4
UNKNOWN114635Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs71.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for G G ALLEN substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.