ENO

Substation

North Carolina

Max voltage
230
kV

ENO is an electric transmission substation in North Carolina. It is classified as high-voltage (230 kv) and connects 15 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage100 kV
Voltage classHigh-voltage (230 kV)
Connected lines15

Ownership & operation

Operator not catalogued for this substation.

Coordinates36.0472, -79.0939

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#43423230 kVIN SERVICE0.1 mi
#37629230 kVIN SERVICE42.8 mi
#49857230 kVIN SERVICE42.8 mi
#28264230 kVIN SERVICE0.1 mi
#34108100 kVIN SERVICE24.5 mi
#37623100 kVIN SERVICE5.6 mi
#37883100 kVIN SERVICE6.5 mi
#38885100 kVIN SERVICE0.2 mi
#40680100 kVIN SERVICE5.7 mi
#46411100 kVIN SERVICE5.9 mi
#3098100 kVIN SERVICE28.3 mi
#57748100 kVIN SERVICE5.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ENO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ENO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP147412Substation-AdjacentNCWake County230 kV300 MW4.3 yrs73.1
TAP147409Substation-AdjacentNCWake County230 kV300 MW4.3 yrs73.1
TAP160803Substation-AdjacentNCWake County230 kV300 MW4.3 yrs72.9
UNKNOWN114536Substation-AdjacentNCDurham County230 kV300 MW4.3 yrs72.8
UNKNOWN114540Substation-AdjacentNCDurham County230 kV300 MW4.3 yrs72.7
UNKNOWN115173Substation-AdjacentNCWake County230 kV300 MW4.3 yrs72.2
UNKNOWN115163Substation-AdjacentNCDurham County230 kV300 MW4.3 yrs72.2
UNKNOWN115165Substation-AdjacentNCWake County230 kV300 MW4.3 yrs71.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.