EDGECOMBE GENCO LLC

Substation

North Carolina · DUKE ENERGY PROGRESS - (NC)

Max voltage
230
kV

EDGECOMBE GENCO LLC is an electric transmission substation in North Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Coordinates36.0157, -77.7727

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#28961230 kV0.1 mi
#29027230 kV0.1 mi
#39104230 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE14.4 mi
#43536230 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE9.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EDGECOMBE GENCO LLC, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EDGECOMBE GENCO LLC substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111486Substation-AdjacentNCWilson County230 kV300 MW4.3 yrs67.0
TAP148063Substation-AdjacentNCWilson County230 kV300 MW4.3 yrs67.0
UNKNOWN111947Substation-AdjacentNCEdgecombe County230 kV300 MW4.3 yrs65.8
TAP148217Substation-AdjacentNCNorthampton County230 kV300 MW4.3 yrs65.7
UNKNOWN111416Substation-AdjacentNCHalifax County230 kV300 MW4.3 yrs65.6
Greenfield (WAKE - CARSON)GreenfieldNCWarren County500 kV1,000 MW3.1 yrs65.5
UNKNOWN158081Substation-AdjacentNCEdgecombe County230 kV300 MW4.3 yrs64.3
TAP148263Substation-AdjacentNCHalifax County230 kV300 MW4.3 yrs63.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EDGECOMBE GENCO LLC substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.