EARLEYS

Substation

North Carolina · VIRGINIA ELECTRIC & POWER CO

Max voltage
230
kV

EARLEYS is an electric transmission substation in North Carolina, operated by VIRGINIA ELECTRIC & POWER CO. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorVIRGINIA ELECTRIC & POWER CO
Coordinates36.2442, -77.1654

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13430230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE1.8 mi
#29878230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE13.7 mi
#56897230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE32.7 mi
#56898230 kVVIRGINIA ELECTRIC & POWER COIN SERVICE13.8 mi
#65196115 kVVIRGINIA ELECTRIC & POWER COIN SERVICE37.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EARLEYS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EARLEYS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BOYKINSSubstation-AdjacentVASouthampton County230 kV300 MW3.1 yrs70.0
UNKNOWN114519Substation-AdjacentVASouthampton County230 kV300 MW3.1 yrs69.3
TAP148239Substation-AdjacentVASouthampton County230 kV300 MW3.1 yrs66.4
TAP148238Substation-AdjacentVAGreensville County115 kV100 MW3.1 yrs65.8
TAP148217Substation-AdjacentNCNorthampton County230 kV300 MW4.3 yrs65.7
TAP148219Substation-AdjacentNCNorthampton County230 kV300 MW3.1 yrs65.6
UNKNOWN111380Substation-AdjacentNCHertford County230 kV300 MW4.3 yrs64.5
UNKNOWN158081Substation-AdjacentNCEdgecombe County230 kV300 MW4.3 yrs64.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EARLEYS substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.