CPI USA NC ROXBORO

Substation

North Carolina

Max voltage
230
kV

CPI USA NC ROXBORO is an electric transmission substation in North Carolina. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

Coordinates36.4368, -78.9575

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#26178230 kVIN SERVICE0.6 mi
#64435230 kV0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CPI USA NC ROXBORO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CPI USA NC ROXBORO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN115116Substation-AdjacentNCDurham County230 kV300 MW4.3 yrs71.4
MAYOSubstation-AdjacentNCPerson County500 kV1,000 MW4.3 yrs70.5
PERSONSubstation-AdjacentNCPerson County500 kV1,000 MW4.3 yrs70.2
ENOSubstation-AdjacentNCOrange County230 kV300 MW4.3 yrs69.9
HALIFAXSubstation-AdjacentVAHalifax County230 kV300 MW3.1 yrs69.4
BARNES JUNCTIONSubstation-AdjacentVACharlotte County115 kV100 MW3.1 yrs68.6
Greenfield (MAYO - DURHAM)GreenfieldNCDurham County500 kV1,000 MW4.3 yrs67.9
UNKNOWN112012Substation-AdjacentNCGranville County230 kV300 MW4.3 yrs67.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CPI USA NC ROXBORO substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.