CPI USA NC ROXBORO
SubstationNorth Carolina
CPI USA NC ROXBORO is an electric transmission substation in North Carolina. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #26178 | 230 kV | — | IN SERVICE | 0.6 mi |
| #64435 | 230 kV | — | — | 0.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of CPI USA NC ROXBORO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN115116 | Substation-Adjacent | NC | Durham County | 230 kV | 300 MW | 4.3 yrs | 71.4 |
| MAYO | Substation-Adjacent | NC | Person County | 500 kV | 1,000 MW | 4.3 yrs | 70.5 |
| PERSON | Substation-Adjacent | NC | Person County | 500 kV | 1,000 MW | 4.3 yrs | 70.2 |
| ENO | Substation-Adjacent | NC | Orange County | 230 kV | 300 MW | 4.3 yrs | 69.9 |
| HALIFAX | Substation-Adjacent | VA | Halifax County | 230 kV | 300 MW | 3.1 yrs | 69.4 |
| BARNES JUNCTION | Substation-Adjacent | VA | Charlotte County | 115 kV | 100 MW | 3.1 yrs | 68.6 |
| Greenfield (MAYO - DURHAM) | Greenfield | NC | Durham County | 500 kV | 1,000 MW | 4.3 yrs | 67.9 |
| UNKNOWN112012 | Substation-Adjacent | NC | Granville County | 230 kV | 300 MW | 4.3 yrs | 67.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for CPI USA NC ROXBORO substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.