CLEVELAND CNTY GENERATING FACILITY

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
230
kV

CLEVELAND CNTY GENERATING FACILITY is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates35.1701, -81.4164

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#30805230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE1.9 mi
#44533230 kVDUKE ENERGY CAROLINAS, LLC0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CLEVELAND CNTY GENERATING FACILITY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CLEVELAND CNTY GENERATING FACILITY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111199Substation-AdjacentNCCleveland County500 kV1,000 MW3.7 yrs79.9
JAMES E. ROGERS ENERGY COMPLEXSubstation-AdjacentNCCleveland County500 kV1,000 MW3.7 yrs77.6
PACOLET TIESubstation-AdjacentSCCherokee County230 kV300 MW3.7 yrs74.7
CLEVELAND CNTY GENERATING FACILITYSubstation-AdjacentSCCherokee County230 kV300 MW4.3 yrs74.3
SHELBY TIESubstation-AdjacentNCCleveland County230 kV300 MW3.7 yrs73.9
Greenfield (UNKNOWN111199 - MCGUIRE)GreenfieldNCGaston County500 kV1,000 MW3.7 yrs73.5
Greenfield (UNKNOWN111199 - MCGUIRE)GreenfieldNCGaston County500 kV1,000 MW3.7 yrs73.0
James E. Rogers Energy ComplexBrownfieldNCRutherford1,010 MW71.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CLEVELAND CNTY GENERATING FACILITY substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.