CENTER

Substation

North Carolina · GEORGIA POWER CO

Max voltage
230
kV

CENTER is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as high-voltage (230 kv) and connects 11 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines11

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates34.0944, -83.4129

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#37680230 kVGEORGIA POWER COIN SERVICE0.8 mi
#40880230 kVGEORGIA POWER COIN SERVICE17.7 mi
#44290230 kVGEORGIA POWER COIN SERVICE26.6 mi
#45545230 kVGEORGIA POWER COIN SERVICE12.4 mi
#36419230 kVGEORGIA POWER COIN SERVICE5.4 mi
#29807230 kVGEORGIA POWER COIN SERVICE8.3 mi
#49348115 kVGEORGIA POWER COIN SERVICE4.8 mi
#22212115 kVGEORGIA POWER COIN SERVICE5.9 mi
#31309115 kVGEORGIA POWER COIN SERVICE4.8 mi
#36974115 kVGEORGIA POWER COIN SERVICE0.5 mi
#2189115 kVGEORGIA POWER COIN SERVICE8.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CENTER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CENTER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MPC GENERATINGSubstation-AdjacentGAWalton County230 kV300 MW5.8 yrs75.7
W R Clayton PlantBrownfieldGAWalton513 MW75.6
UNKNOWN116160Substation-AdjacentGAWalton County230 kV300 MW5.8 yrs72.2
UNKNOWN142331Substation-AdjacentGAWalton County230 kV300 MW5.8 yrs69.0
UNKNOWN116150Substation-AdjacentGAWalton County115 kV100 MW5.8 yrs68.7
UNKNOWN111235Substation-AdjacentGAHall County230 kV300 MW4.3 yrs68.4
EAST SOCIAL CIRCLESubstation-AdjacentGAOconee County230 kV300 MW4.3 yrs68.3
WINDERSubstation-AdjacentGABarrow County230 kV300 MW4.3 yrs68.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.