BUFORD

Substation

North Carolina · GEORGIA POWER CO

Max voltage
115
kV

BUFORD is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates34.1579, -84.0716

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#21587115 kVGEORGIA POWER COIN SERVICE6.1 mi
#43010115 kVGEORGIA POWER COIN SERVICE1.0 mi
#44166115 kVGEORGIA POWER CO0.1 mi
#45374115 kVGEORGIA POWER COIN SERVICE2.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BUFORD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BUFORD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BULL SLUICESubstation-AdjacentGACobb County500 kV1,000 MW5.8 yrs78.1
UNKNOWN111545Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs77.0
UNKNOWN111355Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs76.8
UNKNOWN111533Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs76.5
UNKNOWN111524Substation-AdjacentGACherokee County230 kV300 MW5.8 yrs76.1
UNKNOWN116601Substation-AdjacentGADeKalb County230 kV300 MW5.8 yrs75.8
UNKNOWN111530Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs75.8
MPC GENERATINGSubstation-AdjacentGAWalton County230 kV300 MW5.8 yrs75.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BUFORD substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.