230-KV WEST
SubstationNorth Carolina
230-KV WEST is an electric transmission substation in North Carolina. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #23870 | 230 kV | — | IN SERVICE | 4.2 mi |
| #36732 | 230 kV | — | IN SERVICE | 9.7 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of 230-KV WEST, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP148461 | Substation-Adjacent | NC | Pitt County | 230 kV | 300 MW | 4.3 yrs | 65.4 |
| UNKNOWN169875 | Substation-Adjacent | NC | Pitt County | 230 kV | 300 MW | 4.3 yrs | 65.2 |
| UNKNOWN158081 | Substation-Adjacent | NC | Edgecombe County | 230 kV | 300 MW | 4.3 yrs | 64.3 |
| UNKNOWN172565 | Substation-Adjacent | NC | Pitt County | 230 kV | 300 MW | 4.3 yrs | 64.1 |
| UNKNOWN111659 | Substation-Adjacent | NC | Beaufort County | 230 kV | 300 MW | 4.3 yrs | 63.9 |
| UNKNOWN111469 | Substation-Adjacent | NC | Greene County | 230 kV | 300 MW | 4.3 yrs | 63.2 |
| EVERETTS | Substation-Adjacent | NC | Bertie County | 230 kV | 300 MW | 4.3 yrs | 63.0 |
| UNKNOWN111965 | Substation-Adjacent | NC | Lenoir County | 230 kV | 300 MW | 4.3 yrs | 62.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for 230-KV WEST substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.