TURQUOISE

Substation

New Mexico · PUBLIC SERVICE COMPANY OF NEW MEXICO

Max voltage
115
kV

TURQUOISE is an electric transmission substation in New Mexico, operated by PUBLIC SERVICE COMPANY OF NEW MEXICO. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorPUBLIC SERVICE COMPANY OF NEW MEXICO
Coordinates32.6265, -108.3083

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#80779115 kVPUBLIC SERVICE COMPANY OF NEW MEXICOIN SERVICE1.5 mi
#85477115 kVIN SERVICE23.9 mi
#91040115 kVPUBLIC SERVICE COMPANY OF NEW MEXICOIN SERVICE5.4 mi
#91952115 kVPUBLIC SERVICE COMPANY OF NEW MEXICOIN SERVICE14.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TURQUOISE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TURQUOISE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN300314Substation-AdjacentNMGrant County115 kV100 MW3.5 yrs61.1
IVANHOESubstation-AdjacentNMGrant County115 kV100 MW3.5 yrs60.8
TYRONE (PHELPS DODGE)Substation-AdjacentNMGrant County115 kV100 MW3.5 yrs60.6
LORDSBURGSubstation-AdjacentNMHidalgo County115 kV100 MW3.5 yrs60.5
HIDALGOSubstation-AdjacentNMGrant County345 kV600 MW3.5 yrs59.2
Greenfield (LUNA - HIDALGO)GreenfieldNMGrant County345 kV600 MW3.5 yrs59.1
Greenfield (HIDALGO - GREENLEE)GreenfieldNMGrant County345 kV600 MW3.5 yrs59.1
Greenfield (LUNA - HIDALGO)GreenfieldNMGrant County345 kV600 MW3.5 yrs58.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TURQUOISE substation, New Mexico. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.