TAP308008

Substation

New Mexico · ARKANSAS RIVER POWER AUTHORITY

Max voltage
115
kV

TAP308008 is an electric transmission substation in New Mexico, operated by ARKANSAS RIVER POWER AUTHORITY. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorARKANSAS RIVER POWER AUTHORITY
Coordinates36.8735, -104.4677

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84395115 kVARKANSAS RIVER POWER AUTHORITY21.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP308008, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP308008 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BURRO CANYONSubstation-AdjacentNMColfax County230 kV300 MW1.7 yrs61.7
Greenfield (WALSENBURG - GLADSTONE)GreenfieldCOLas Animas County230 kV300 MW3.4 yrs61.6
Greenfield (WALSENBURG - GLADSTONE)GreenfieldCOLas Animas County230 kV300 MW3.4 yrs60.8
Greenfield (WALSENBURG - GLADSTONE)GreenfieldCOLas Animas County230 kV300 MW3.4 yrs60.0
TAP308008Substation-AdjacentNMColfax County115 kV100 MW3.5 yrs59.7
TAP208068Substation-AdjacentCOLas Animas County138 kV100 MW1.7 yrs58.6
UNKNOWN202848Substation-AdjacentCOCostilla County230 kV300 MW1.7 yrs58.2
Greenfield (WALSENBURG - GLADSTONE)GreenfieldCOLas Animas County230 kV300 MW3.4 yrs58.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP308008 substation, New Mexico. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.