SARA-1

Substation

New Mexico · PUBLIC SERVICE COMPANY OF NEW MEXICO

Max voltage
115
kV

SARA-1 is an electric transmission substation in New Mexico, operated by PUBLIC SERVICE COMPANY OF NEW MEXICO. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorPUBLIC SERVICE COMPANY OF NEW MEXICO
Coordinates35.2276, -106.6545

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#92961115 kVPUBLIC SERVICE COMPANY OF NEW MEXICOIN SERVICE0.0 mi
#92962115 kVPUBLIC SERVICE COMPANY OF NEW MEXICOIN SERVICE0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SARA-1, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SARA-1 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SANDIASubstation-AdjacentNMBernalillo County345 kV600 MW3.4 yrs72.9
WEST MESASubstation-AdjacentNMBernalillo County345 kV600 MW3.4 yrs70.7
NORTHSubstation-AdjacentNMBernalillo County115 kV100 MW3.4 yrs68.4
MENAULSubstation-AdjacentNMBernalillo County115 kV100 MW3.4 yrs68.2
RIO PUERCOSubstation-AdjacentNMBernalillo County345 kV600 MW3.4 yrs68.1
CENTRAL CAMPUS (UNM)Substation-AdjacentNMBernalillo County115 kV100 MW3.4 yrs67.9
RANDOLPHSubstation-AdjacentNMBernalillo County115 kV100 MW3.4 yrs67.8
FOUR HILLSSubstation-AdjacentNMBernalillo County115 kV100 MW3.4 yrs67.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SARA-1 substation, New Mexico. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.