JARALES TAP

Substation

New Mexico · PUBLIC SERVICE COMPANY OF NEW MEXICO

Max voltage
115
kV

JARALES TAP is an electric transmission substation in New Mexico, operated by PUBLIC SERVICE COMPANY OF NEW MEXICO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPUBLIC SERVICE COMPANY OF NEW MEXICO
Coordinates34.6158, -106.7776

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81137115 kVPUBLIC SERVICE COMPANY OF NEW MEXICOIN SERVICE3.3 mi
#82182115 kVIN SERVICE2.3 mi
#87090115 kVPUBLIC SERVICE COMPANY OF NEW MEXICOIN SERVICE1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of JARALES TAP, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near JARALES TAP substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (WEST MESA - SANDIA)GreenfieldNMBernalillo County345 kV600 MW3.4 yrs67.0
STUDIO TAPSubstation-AdjacentNMBernalillo County115 kV100 MW3.4 yrs66.0
Valencia Energy FacilityBrownfieldNMValencia County115 kV497 MW3.5 yrs65.8
STUDIOSubstation-AdjacentNMBernalillo County115 kV100 MW3.4 yrs65.0
PALACESubstation-AdjacentNMBernalillo County115 kV100 MW3.4 yrs64.5
BELENSubstation-AdjacentNMValencia County115 kV100 MW3.4 yrs62.7
Greenfield (WEST MESA - ARROYO)GreenfieldNMBernalillo County345 kV600 MW3.5 yrs62.3
Greenfield (WEST MESA - ARROYO)GreenfieldNMValencia County345 kV600 MW3.5 yrs62.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for JARALES TAP substation, New Mexico. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.