CHURCH ROCK TAP

Substation

New Mexico · NAVAJO TRIBAL UTILITY AUTHORITY

Max voltage
115
kV

CHURCH ROCK TAP is an electric transmission substation in New Mexico, operated by NAVAJO TRIBAL UTILITY AUTHORITY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNAVAJO TRIBAL UTILITY AUTHORITY
Coordinates35.6093, -108.5518

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84540115 kVIN SERVICE20.9 mi
#84905115 kVNAVAJO TRIBAL UTILITY AUTHORITYIN SERVICE18.1 mi
#88518115 kVNAVAJO TRIBAL UTILITY AUTHORITYIN SERVICE4.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CHURCH ROCK TAP, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CHURCH ROCK TAP substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MCKINLEYSubstation-AdjacentNMMcKinley County345 kV600 MW3.5 yrs65.5
Greenfield (MCKINLEY - SPRINGERVILLE)GreenfieldNMMcKinley County345 kV600 MW3.5 yrs60.3
UNKNOWN303765Substation-AdjacentNMMcKinley County115 kV100 MW3.5 yrs59.7
Greenfield (MCKINLEY - SPRINGERVILLE)GreenfieldAZApache County345 kV600 MW3.5 yrs59.5
CINIZASubstation-AdjacentNMMcKinley County115 kV100 MW3.5 yrs58.9
Greenfield (SAN JUAN - MCKINLEY)GreenfieldNMMcKinley County345 kV600 MW3.5 yrs58.6
UNKNOWN302098Substation-AdjacentNMMcKinley County115 kV100 MW3.5 yrs58.3
CHURCH ROCK TAPSubstation-AdjacentNMMcKinley County115 kV100 MW3.5 yrs58.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CHURCH ROCK TAP substation, New Mexico. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.