BURNHAM

Substation

New Mexico · NAVAJO TRIBAL UTILITY AUTHORITY

Max voltage
230
kV

BURNHAM is an electric transmission substation in New Mexico, operated by NAVAJO TRIBAL UTILITY AUTHORITY. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorNAVAJO TRIBAL UTILITY AUTHORITY
Coordinates36.4936, -108.2331

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#87458230 kVNAVAJO TRIBAL UTILITY AUTHORITYIN SERVICE2.3 mi
#90325230 kVNAVAJO TRIBAL UTILITY AUTHORITYIN SERVICE5.1 mi
#89950115 kVNAVAJO TRIBAL UTILITY AUTHORITYIN SERVICE2.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BURNHAM, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BURNHAM substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FOUR CORNERSSubstation-AdjacentNMSan Juan County500 kV1,000 MW3.5 yrs67.9
SAN JUANSubstation-AdjacentNMSan Juan County500 kV1,000 MW3.5 yrs63.1
WATERFLOWSubstation-AdjacentNMSan Juan County345 kV600 MW3.5 yrs61.1
SHIPROCKSubstation-AdjacentNMSan Juan County345 kV600 MW3.5 yrs60.4
HART CANYONSubstation-AdjacentCOLa Plata County115 kV100 MW3.5 yrs60.1
GALLEGOSSubstation-AdjacentNMSan Juan County230 kV300 MW3.5 yrs58.8
Pinon Energy CenterBrownfieldNMSan Juan293 MW58.6
ANIMASSubstation-AdjacentNMSan Juan County115 kV100 MW3.5 yrs57.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BURNHAM substation, New Mexico. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.