AFTON

Substation

New Mexico · EL PASO ELECTRIC POWER COMPANY

Max voltage
345
kV

AFTON is an electric transmission substation in New Mexico, operated by EL PASO ELECTRIC POWER COMPANY. It is classified as high-voltage (345 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines2

Ownership & operation

OperatorEL PASO ELECTRIC POWER COMPANY
Coordinates32.1141, -106.8483

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83833345 kVIN SERVICE57.1 mi
#91861345 kVEL PASO ELECTRIC POWER COMPANYIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of AFTON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near AFTON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ARROYOSubstation-AdjacentNMDoña Ana County345 kV600 MW3.4 yrs70.2
AFTON GENERATING STATIONSubstation-AdjacentNMDoña Ana County345 kV600 MW3.5 yrs69.8
RIO GRANDESubstation-AdjacentTXEl Paso County115 kV100 MW3.4 yrs67.8
SUNSET NORTHSubstation-AdjacentTXEl Paso County115 kV100 MW3.4 yrs67.8
DIABLOSubstation-AdjacentTXEl Paso County345 kV600 MW3.4 yrs66.9
THORNSubstation-AdjacentTXEl Paso County115 kV100 MW3.4 yrs66.8
MONTOYASubstation-AdjacentTXEl Paso County115 kV100 MW3.4 yrs66.2
RIPLEYSubstation-AdjacentTXEl Paso County115 kV100 MW3.4 yrs65.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen