TAP140899

Substation

New Jersey · JERSEY CENTRAL POWER & LT CO

Max voltage
230
kV

TAP140899 is an electric transmission substation in New Jersey, operated by JERSEY CENTRAL POWER & LT CO. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorJERSEY CENTRAL POWER & LT CO
Coordinates40.3656, -74.3537

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#64910230 kVJERSEY CENTRAL POWER & LT COIN SERVICE5.8 mi
#65468230 kVJERSEY CENTRAL POWER & LT COIN SERVICE7.5 mi
#65469230 kVJERSEY CENTRAL POWER & LT COIN SERVICE0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP140899, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP140899 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DEANSSubstation-AdjacentNJMiddlesex County500 kV1,000 MW3.0 yrs77.7
DEANSSubstation-AdjacentNJMiddlesex County500 kV1,000 MW2.6 yrs77.0
EAST WINDSORSubstation-AdjacentNJMercer County500 kV1,000 MW2.6 yrs76.7
BRANCHBURGSubstation-AdjacentNJSomerset County500 kV1,000 MW3.0 yrs75.9
WINDSORSubstation-AdjacentNJMercer County230 kV300 MW2.6 yrs74.9
PSEG Linden Generating StationBrownfieldNJUnion381 MW74.6
LAWRENCE SWSubstation-AdjacentNJMercer County230 kV300 MW3.0 yrs74.4
KEARNYSubstation-AdjacentNJHudson County230 kV300 MW3.5 yrs73.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP140899 substation, New Jersey. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.