WHITE LAKE

Substation

New Hampshire · PUBLIC SERVICE CO OF NH

Max voltage
115
kV

WHITE LAKE is an electric transmission substation in New Hampshire, operated by PUBLIC SERVICE CO OF NH. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorPUBLIC SERVICE CO OF NH
Coordinates43.8448, -71.2057

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#19396115 kVPUBLIC SERVICE CO OF NH0.0 mi
#19646115 kVPUBLIC SERVICE CO OF NHIN SERVICE0.3 mi
#21705115 kVPUBLIC SERVICE CO OF NHIN SERVICE13.9 mi
#50495115 kVPUBLIC SERVICE CO OF NHIN SERVICE1.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WHITE LAKE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WHITE LAKE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN132701Substation-AdjacentNHBelknap County115 kV100 MW3.5 yrs64.9
TAP174652Substation-AdjacentNHCarroll County115 kV100 MW3.5 yrs64.7
UNKNOWN137028Substation-AdjacentNHCarroll County115 kV100 MW3.5 yrs64.7
UNKNOWN137030Substation-AdjacentNHCarroll County115 kV100 MW3.5 yrs64.6
UNKNOWN132700Substation-AdjacentNHBelknap County115 kV100 MW3.5 yrs64.5
Greenfield (BUXTON - DEERFIELD)GreenfieldMEYork County345 kV600 MW3.5 yrs62.9
UNKNOWN132700Substation-AdjacentNHBelknap County115 kV100 MW3.5 yrs61.4
UNKNOWN132702Substation-AdjacentNHBelknap County115 kV100 MW3.5 yrs61.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen