TAP174652

Substation

New Hampshire · PUBLIC SERVICE CO OF NH

Max voltage
115
kV

TAP174652 is an electric transmission substation in New Hampshire, operated by PUBLIC SERVICE CO OF NH. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorPUBLIC SERVICE CO OF NH
Coordinates44.0926, -71.1533

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#63172115 kVPUBLIC SERVICE CO OF NHIN SERVICE8.1 mi
#63173115 kVPUBLIC SERVICE CO OF NHIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP174652, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP174652 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN137028Substation-AdjacentNHCarroll County115 kV100 MW3.5 yrs64.7
TAP174652Substation-AdjacentNHCarroll County115 kV100 MW3.5 yrs64.7
UNKNOWN137030Substation-AdjacentNHCarroll County115 kV100 MW3.5 yrs64.6
UNKNOWN137038Substation-AdjacentNHCoos County115 kV100 MW3.5 yrs62.5
UNKNOWN136667Substation-AdjacentNHCarroll County115 kV100 MW3.5 yrs61.0
Greenfield (UNKNOWN136667 - KIMBALL ROAD)GreenfieldNHCarroll County115 kV100 MW3.5 yrs57.2
UNKNOWN132759Substation-AdjacentNHCoos County115 kV100 MW3.5 yrs56.8
Greenfield (UNKNOWN132759 - UNKNOWN137038)GreenfieldNHCoos County115 kV100 MW3.5 yrs56.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP174652 substation, New Hampshire. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.