TAP136927
SubstationNew Hampshire · PUBLIC SERVICE CO OF NH
TAP136927 is an electric transmission substation in New Hampshire, operated by PUBLIC SERVICE CO OF NH. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #40667 | 115 kV | PUBLIC SERVICE CO OF NH | IN SERVICE | 5.5 mi |
| #59499 | 115 kV | PUBLIC SERVICE CO OF NH | IN SERVICE | 0.0 mi |
| #59500 | 115 kV | PUBLIC SERVICE CO OF NH | IN SERVICE | 0.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP136927, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ESSENTIAL POWER NEWINGTON LLC | Substation-Adjacent | NH | Rockingham County | 345 kV | 600 MW | 3.5 yrs | 73.1 |
| ELIOT | Substation-Adjacent | NH | Strafford County | 345 kV | 600 MW | 3.5 yrs | 72.0 |
| DEERFIELD | Substation-Adjacent | NH | Strafford County | 345 kV | 600 MW | 3.5 yrs | 71.6 |
| UNKNOWN132750 | Substation-Adjacent | NH | Rockingham County | 345 kV | 600 MW | 3.5 yrs | 71.2 |
| MAGUIRE ROAD | Substation-Adjacent | ME | York County | 345 kV | 600 MW | 3.5 yrs | 70.2 |
| TIMBER SWAMP | Substation-Adjacent | NH | Rockingham County | 345 kV | 600 MW | 3.5 yrs | 70.0 |
| TAP137045 | Substation-Adjacent | MA | Essex County | 345 kV | 600 MW | 3.5 yrs | 69.6 |
| UNKNOWN132750 | Substation-Adjacent | NH | Rockingham County | 345 kV | 600 MW | 3.5 yrs | 69.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.