PINETREE POWER TAMWORTH
SubstationNew Hampshire · PUBLIC SERVICE CO OF NH
PINETREE POWER TAMWORTH is an electric transmission substation in New Hampshire, operated by PUBLIC SERVICE CO OF NH. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #21489 | 115 kV | PUBLIC SERVICE CO OF NH | — | 0.0 mi |
| #50495 | 115 kV | PUBLIC SERVICE CO OF NH | IN SERVICE | 1.3 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of PINETREE POWER TAMWORTH, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN132701 | Substation-Adjacent | NH | Belknap County | 115 kV | 100 MW | 3.5 yrs | 64.9 |
| TAP174652 | Substation-Adjacent | NH | Carroll County | 115 kV | 100 MW | 3.5 yrs | 64.7 |
| UNKNOWN137028 | Substation-Adjacent | NH | Carroll County | 115 kV | 100 MW | 3.5 yrs | 64.7 |
| UNKNOWN137030 | Substation-Adjacent | NH | Carroll County | 115 kV | 100 MW | 3.5 yrs | 64.6 |
| UNKNOWN132700 | Substation-Adjacent | NH | Belknap County | 115 kV | 100 MW | 3.5 yrs | 64.5 |
| Greenfield (BUXTON - DEERFIELD) | Greenfield | ME | York County | 345 kV | 600 MW | 3.5 yrs | 62.9 |
| UNKNOWN132700 | Substation-Adjacent | NH | Belknap County | 115 kV | 100 MW | 3.5 yrs | 61.4 |
| UNKNOWN132702 | Substation-Adjacent | NH | Belknap County | 115 kV | 100 MW | 3.5 yrs | 61.0 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for PINETREE POWER TAMWORTH substation, New Hampshire. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.