NEWINGTON 345KV

Substation

New Hampshire · PUBLIC SERVICE CO OF NH

Max voltage
345
kV

NEWINGTON 345KV is an electric transmission substation in New Hampshire, operated by PUBLIC SERVICE CO OF NH. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines4

Ownership & operation

OperatorPUBLIC SERVICE CO OF NH
Coordinates43.1173, -70.8021

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#18422345 kVPUBLIC SERVICE CO OF NHIN SERVICE1.3 mi
#22800345 kVIN SERVICE6.5 mi
#35638345 kVPUBLIC SERVICE CO OF NH0.1 mi
#36978345 kVPUBLIC SERVICE CO OF NHIN SERVICE12.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NEWINGTON 345KV, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NEWINGTON 345KV substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ESSENTIAL POWER NEWINGTON LLCSubstation-AdjacentNHRockingham County345 kV600 MW3.5 yrs73.1
ELIOTSubstation-AdjacentNHStrafford County345 kV600 MW3.5 yrs72.0
DEERFIELDSubstation-AdjacentNHStrafford County345 kV600 MW3.5 yrs71.6
UNKNOWN132750Substation-AdjacentNHRockingham County345 kV600 MW3.5 yrs71.2
MAGUIRE ROADSubstation-AdjacentMEYork County345 kV600 MW3.5 yrs70.2
TIMBER SWAMPSubstation-AdjacentNHRockingham County345 kV600 MW3.5 yrs70.0
TAP137045Substation-AdjacentMAEssex County345 kV600 MW3.5 yrs69.6
UNKNOWN132750Substation-AdjacentNHRockingham County345 kV600 MW3.5 yrs69.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen