TAP161753

Substation

Nebraska · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
115
kV

TAP161753 is an electric transmission substation in Nebraska, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates41.8190, -103.7998

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#39303115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION0.4 mi
#50774115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION11.5 mi
#50775115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP161753, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP161753 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
STEGALLSubstation-AdjacentNEScotts Bluff County345 kV600 MW1.7 yrs69.7
UNKNOWN202179Substation-AdjacentNEScotts Bluff County345 kV600 MW3.5 yrs69.6
UNKNOWN131802Substation-AdjacentNEScotts Bluff County230 kV300 MW3.5 yrs68.4
UNKNOWN204234Substation-AdjacentNEBanner County230 kV300 MW1.7 yrs65.1
Greenfield (UNKNOWN202528 - STEGALL)GreenfieldNEScotts Bluff County230 kV300 MW1.0 yrs64.8
UNKNOWN209367Substation-AdjacentWYGoshen County115 kV100 MW1.7 yrs64.6
Western Sugar Coop - TorringtonBrownfieldWYGoshen2 MW64.6
UNKNOWN209365Substation-AdjacentWYGoshen County115 kV100 MW1.7 yrs64.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.