TAP144232

Substation

Nebraska · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
115
kV

TAP144232 is an electric transmission substation in Nebraska, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates42.2973, -102.8882

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#22828115 kVWAPA-- WESTERN AREA POWER ADMINISTRATIONIN SERVICE0.0 mi
#44898115 kVWAPA-- WESTERN AREA POWER ADMINISTRATIONIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP144232, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP144232 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN132450Substation-AdjacentNEBox Butte County115 kV100 MW3.5 yrs63.0
UNKNOWN132448Substation-AdjacentNEDawes County115 kV100 MW1.0 yrs62.3
TAP144233Substation-AdjacentNEBox Butte County115 kV100 MW3.5 yrs62.1
UNKNOWN132445Substation-AdjacentNEBox Butte County115 kV100 MW3.5 yrs62.0
UNKNOWN132453Substation-AdjacentNEBox Butte County115 kV100 MW3.5 yrs60.7
Greenfield (UNKNOWN132448 - TAP144232)GreenfieldNEBox Butte County115 kV100 MW1.0 yrs58.9
Greenfield (UNKNOWN132448 - TAP144232)GreenfieldNEBox Butte County115 kV100 MW1.0 yrs57.0
Greenfield (UNKNOWN132445 - UNKNOWN132450)GreenfieldNEBox Butte County115 kV100 MW3.5 yrs56.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.