JOHNSON 2

Substation

Nebraska · DAWSON POWER DISTRICT

Max voltage
115
kV

JOHNSON 2 is an electric transmission substation in Nebraska, operated by DAWSON POWER DISTRICT. It is classified as sub-transmission (115 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines7

Ownership & operation

OperatorDAWSON POWER DISTRICT
Coordinates40.6526, -99.7925

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4827115 kVDAWSON POWER DISTRICTIN SERVICE1.8 mi
#25843115 kVDAWSON POWER DISTRICTIN SERVICE34.4 mi
#27251115 kVDAWSON POWER DISTRICTIN SERVICE24.2 mi
#33814115 kVDAWSON POWER DISTRICTIN SERVICE4.6 mi
#35169115 kVDAWSON POWER DISTRICTIN SERVICE3.7 mi
#46362115 kVDAWSON POWER DISTRICTIN SERVICE1.8 mi
#64878115 kVDAWSON POWER DISTRICT0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of JOHNSON 2, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near JOHNSON 2 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN131917Substation-AdjacentNEDawson County230 kV300 MW3.5 yrs69.5
UNKNOWN131772Substation-AdjacentNEDawson County230 kV300 MW3.5 yrs68.3
SWEETWATERSubstation-AdjacentNEDawson County345 kV600 MW3.5 yrs68.1
TAP148612Substation-AdjacentNEDawson County115 kV100 MW3.5 yrs64.5
JOHNSON 1Substation-AdjacentNEDawson County115 kV100 MW3.5 yrs64.3
UNKNOWN131776Substation-AdjacentNEPhelps County115 kV100 MW3.5 yrs64.0
UNKNOWN131958Substation-AdjacentNEFurnas County115 kV100 MW3.5 yrs63.6
UNKNOWN131770Substation-AdjacentNEDawson County115 kV100 MW3.5 yrs63.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for JOHNSON 2 substation, Nebraska. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.