TIBER DAM HYDROELECTRIC PLANT

Substation

Montana · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
115
kV

TIBER DAM HYDROELECTRIC PLANT is an electric transmission substation in Montana, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
StateMontana
Coordinates48.3191, -111.0987

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73147115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TIBER DAM HYDROELECTRIC PLANT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TIBER DAM HYDROELECTRIC PLANT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TIBER TAPSubstation-AdjacentMTLiberty County115 kV100 MW1.1 yrs69.3
UNKNOWN201537Substation-AdjacentMTLiberty County115 kV100 MW1.1 yrs68.8
Greenfield (TIBER TAP - RUDYARD)GreenfieldMTLiberty County115 kV100 MW1.1 yrs65.6
Greenfield (TIBER TAP - RUDYARD)GreenfieldMTLiberty County115 kV100 MW1.1 yrs64.5
Greenfield (SHELBY - TIBER TAP)GreenfieldMTLiberty County115 kV100 MW1.1 yrs63.3
Greenfield (TIBER TAP - RUDYARD)GreenfieldMTLiberty County115 kV100 MW1.1 yrs63.3
Greenfield (SHELBY - TIBER TAP)GreenfieldMTLiberty County115 kV100 MW1.1 yrs63.1
Greenfield (TIBER TAP - UNKNOWN201537)GreenfieldMTLiberty County115 kV100 MW1.1 yrs62.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TIBER DAM HYDROELECTRIC PLANT substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.