TAP209945

Substation

Montana · NORTHWESTERN ENERGY LLC - (MT)

Max voltage
230
kV

TAP209945 is an electric transmission substation in Montana, operated by NORTHWESTERN ENERGY LLC - (MT). It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorNORTHWESTERN ENERGY LLC - (MT)
StateMontana
Coordinates45.1075, -106.9155

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#79072230 kVNORTHWESTERN ENERGY LLC - (MT)0.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209945, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209945 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DECKERSubstation-AdjacentWYSheridan County230 kV300 MW1.1 yrs76.0
TAP209945Substation-AdjacentWYSheridan County230 kV300 MW1.1 yrs75.8
TAP209947Substation-AdjacentWYSheridan County230 kV300 MW1.1 yrs75.5
TAP209946Substation-AdjacentWYSheridan County230 kV300 MW1.1 yrs74.7
TAP209950Substation-AdjacentWYSheridan County230 kV300 MW1.1 yrs73.9
TAP205618Substation-AdjacentWYSheridan County230 kV300 MW1.7 yrs73.3
TONGUE RIVERSubstation-AdjacentWYSheridan County230 kV300 MW1.7 yrs71.7
Greenfield (DECKER - UNKNOWN202499)GreenfieldWYSheridan County230 kV300 MW1.1 yrs70.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209945 substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.