TAP208289

Substation

Montana · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
115
kV

TAP208289 is an electric transmission substation in Montana, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
StateMontana
Coordinates48.0900, -105.7080

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#69298115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION27.1 mi
#76243115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION0.3 mi
#76507115 kVWAPA-- WESTERN AREA POWER ADMINISTRATION0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208289, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208289 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WOLF POINTSubstation-AdjacentMTMcCone County230 kV300 MW1.1 yrs74.0
TAP204499Substation-AdjacentMTDaniels County115 kV100 MW1.1 yrs67.3
Greenfield (FORT PECK - WOLF POINT)GreenfieldMTMcCone County230 kV300 MW1.1 yrs67.3
Greenfield (UNKNOWN202118 - WOLF POINT)GreenfieldMTRoosevelt County138 kV100 MW1.1 yrs66.1
Greenfield (TAP208289 - UNKNOWN202143)GreenfieldMTRoosevelt County115 kV100 MW1.1 yrs65.6
Greenfield (FORT PECK - WOLF POINT)GreenfieldMTValley County230 kV300 MW1.1 yrs65.4
Greenfield (WOLF POINT - TAP204499)GreenfieldMTRoosevelt County115 kV100 MW1.1 yrs64.8
Greenfield (UNKNOWN204555 - DAWSON COUNTY)GreenfieldMTMcCone County230 kV300 MW1.1 yrs63.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP208289 substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.