TAP208247

Substation

Montana · ENBRIDGE TRANS CANADA

Max voltage
230
kV

TAP208247 is an electric transmission substation in Montana, operated by ENBRIDGE TRANS CANADA. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorENBRIDGE TRANS CANADA
StateMontana
Coordinates49.8160, -112.5783

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72581230 kVENBRIDGE TRANS CANADA86.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208247, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208247 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP208247Substation-AdjacentMTGlacier County230 kV300 MW1.1 yrs63.3
Greenfield (UNKNOWN206281 - TAP208247)GreenfieldMTGlacier County230 kV300 MW1.1 yrs58.2
Greenfield (UNKNOWN206281 - TAP208247)GreenfieldMTGlacier County230 kV300 MW1.1 yrs57.7
Greenfield (UNKNOWN206281 - TAP208247)GreenfieldMTGlacier County230 kV300 MW1.1 yrs57.3
Greenfield (UNKNOWN206281 - TAP208247)GreenfieldMTGlacier County230 kV300 MW1.1 yrs56.7
Greenfield (UNKNOWN206281 - TAP208247)GreenfieldMTGlacier County230 kV300 MW1.1 yrs55.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP208247 substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.