TAP206227

Substation

Montana · NORTHWESTERN ENERGY LLC - (MT)

Max voltage
138
kV

TAP206227 is an electric transmission substation in Montana, operated by NORTHWESTERN ENERGY LLC - (MT). It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorNORTHWESTERN ENERGY LLC - (MT)
StateMontana
Coordinates47.4722, -111.2543

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#74558138 kVNORTHWESTERN ENERGY LLC - (MT)0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206227, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206227 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP203658Substation-AdjacentMTCascade County230 kV300 MW1.1 yrs72.6
HIGHWOOD GENERATING STATIONSubstation-AdjacentMTCascade County230 kV300 MW1.1 yrs71.4
UNKNOWN206326Substation-AdjacentMTCascade County230 kV300 MW1.1 yrs71.4
GREAT FALLS (RAINBOW)Substation-AdjacentMTCascade County230 kV300 MW1.1 yrs71.0
UNKNOWN206569Substation-AdjacentMTCascade County115 kV100 MW1.1 yrs70.5
UNKNOWN204147Substation-AdjacentMTCascade County115 kV100 MW1.1 yrs69.7
UNKNOWN201836Substation-AdjacentMTCascade County115 kV100 MW1.1 yrs69.3
Greenfield (HAVRE / ASSINNIBOINE - UNKNOWN)GreenfieldMTChouteau County230 kV300 MW1.1 yrs69.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen