TAP205596

Substation

Montana · FERGUS ELECTRIC COOP, INC

Max voltage
115
kV

TAP205596 is an electric transmission substation in Montana, operated by FERGUS ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorFERGUS ELECTRIC COOP, INC
StateMontana
Coordinates46.8814, -109.7654

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#71032115 kVFERGUS ELECTRIC COOP, INC17.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205596, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205596 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JUDITH GAP WIND ENERGY CENTERSubstation-AdjacentMTWheatland County230 kV300 MW1.1 yrs74.5
JUDITH GAPSubstation-AdjacentMTWheatland County230 kV300 MW1.1 yrs74.3
JUDITH GAP WIND FARMSubstation-AdjacentMTWheatland County230 kV300 MW1.1 yrs74.3
TAP205596Substation-AdjacentMTWheatland County115 kV100 MW1.1 yrs69.9
Greenfield (JUDITH GAP - UNKNOWN206326)GreenfieldMTWheatland County230 kV300 MW1.1 yrs68.4
UNKNOWN206835Substation-AdjacentMTJudith Basin County138 kV100 MW1.1 yrs67.9
Greenfield (JUDITH GAP - UNKNOWN206326)GreenfieldMTWheatland County230 kV300 MW1.1 yrs67.8
Greenfield (JUDITH GAP - UNKNOWN206326)GreenfieldMTJudith Basin County230 kV300 MW1.1 yrs66.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205596 substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.