TAP205570

Substation

Montana · TONGUE RIVER ELECTRIC COOP INC

Max voltage
115
kV

TAP205570 is an electric transmission substation in Montana, operated by TONGUE RIVER ELECTRIC COOP INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorTONGUE RIVER ELECTRIC COOP INC
StateMontana
Coordinates45.8454, -106.7716

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70996115 kVTONGUE RIVER ELECTRIC COOP INC5.8 mi
#71003115 kVTONGUE RIVER ELECTRIC COOP INC15.5 mi
#74591115 kVTONGUE RIVER ELECTRIC COOP INC0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205570, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205570 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COLSTRIPSubstation-AdjacentMTRosebud County500 kV1,000 MW1.1 yrs80.4
Greenfield (BROADVIEW - COLSTRIP)GreenfieldMTRosebud County500 kV1,000 MW1.1 yrs77.2
Greenfield (BROADVIEW - COLSTRIP)GreenfieldMTRosebud County500 kV1,000 MW1.1 yrs75.6
Greenfield (BROADVIEW - COLSTRIP)GreenfieldMTRosebud County500 kV1,000 MW1.1 yrs75.5
Greenfield (BROADVIEW - COLSTRIP)GreenfieldMTRosebud County500 kV1,000 MW1.1 yrs75.1
Greenfield (BROADVIEW - COLSTRIP)GreenfieldMTRosebud County500 kV1,000 MW1.1 yrs74.7
UNKNOWN205569Substation-AdjacentMTRosebud County115 kV100 MW1.1 yrs74.1
Greenfield (BROADVIEW - COLSTRIP)GreenfieldMTRosebud County500 kV1,000 MW1.1 yrs73.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205570 substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.