TAP205563

Substation

Montana · TONGUE RIVER ELECTRIC COOP INC

Max voltage
115
kV

TAP205563 is an electric transmission substation in Montana, operated by TONGUE RIVER ELECTRIC COOP INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorTONGUE RIVER ELECTRIC COOP INC
StateMontana
Coordinates45.6059, -106.2853

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70994115 kVTONGUE RIVER ELECTRIC COOP INC1.1 mi
#70995115 kVTONGUE RIVER ELECTRIC COOP INC0.2 mi
#71512115 kVTONGUE RIVER ELECTRIC COOP INC21.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205563, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205563 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COLSTRIPSubstation-AdjacentMTRosebud County500 kV1,000 MW1.1 yrs80.4
UNKNOWN205569Substation-AdjacentMTRosebud County115 kV100 MW1.1 yrs74.1
UNKNOWN204535Substation-AdjacentMTRosebud County115 kV100 MW1.1 yrs73.6
UNKNOWN205568Substation-AdjacentMTRosebud County115 kV100 MW1.1 yrs73.1
UNKNOWN205562Substation-AdjacentMTPowder River County115 kV100 MW1.1 yrs68.4
TAP206226Substation-AdjacentMTPowder River County115 kV100 MW1.1 yrs68.3
EC Near ColstripGreenfieldMTRosebud1.1 yrs67.8
EC Coal Rosebud CountyGreenfieldMTRosebud County1.1 yrs67.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205563 substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.