TAP205551

Substation

Montana · MID-YELLOWSTONE ELEC COOP INC

Max voltage
115
kV

TAP205551 is an electric transmission substation in Montana, operated by MID-YELLOWSTONE ELEC COOP INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorMID-YELLOWSTONE ELEC COOP INC
StateMontana
Coordinates46.2736, -106.1964

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70979115 kVMID-YELLOWSTONE ELEC COOP INC6.5 mi
#70980115 kVMID-YELLOWSTONE ELEC COOP INC3.6 mi
#70981115 kVMID-YELLOWSTONE ELEC COOP INC0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205551, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205551 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROSEBUD CREEKSubstation-AdjacentMTRosebud County230 kV300 MW1.1 yrs73.4
UNKNOWN206225Substation-AdjacentMTCuster County115 kV100 MW1.1 yrs72.4
TAP205543Substation-AdjacentMTCuster County115 kV100 MW1.1 yrs70.9
TAP205554Substation-AdjacentMTRosebud County115 kV100 MW1.1 yrs70.9
TAP205547Substation-AdjacentMTCuster County115 kV100 MW1.1 yrs70.6
TAP205544Substation-AdjacentMTCuster County115 kV100 MW1.1 yrs70.5
TAP205551Substation-AdjacentMTRosebud County115 kV100 MW1.1 yrs70.4
UNKNOWN205553Substation-AdjacentMTRosebud County115 kV100 MW1.1 yrs70.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205551 substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.