TAP205528

Substation

Montana · SHERIDAN ELECTRIC COOP, INC

Max voltage
115
kV

TAP205528 is an electric transmission substation in Montana, operated by SHERIDAN ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorSHERIDAN ELECTRIC COOP, INC
StateMontana
Coordinates48.3441, -105.2131

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70953115 kVSHERIDAN ELECTRIC COOP, INC10.0 mi
#70954115 kVSHERIDAN ELECTRIC COOP, INC6.0 mi
#70955115 kVSHERIDAN ELECTRIC COOP, INC12.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205528, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205528 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN202143Substation-AdjacentMTRoosevelt County138 kV100 MW1.1 yrs70.3
TAP205528Substation-AdjacentMTRoosevelt County115 kV100 MW1.1 yrs68.8
UNKNOWN205529Substation-AdjacentMTRoosevelt County115 kV100 MW1.1 yrs68.4
TAP205526Substation-AdjacentMTDaniels County115 kV100 MW1.1 yrs68.4
TAP204622Substation-AdjacentMTRoosevelt County115 kV100 MW1.1 yrs68.0
TAP205527Substation-AdjacentMTRoosevelt County115 kV100 MW1.1 yrs66.1
Greenfield (UNKNOWN202118 - WOLF POINT)GreenfieldMTRoosevelt County138 kV100 MW1.1 yrs66.1
Greenfield (TAP208289 - UNKNOWN202143)GreenfieldMTRoosevelt County115 kV100 MW1.1 yrs65.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205528 substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.