TAP204491

Substation

Montana · AVISTA CORP

Max voltage
230
kV

TAP204491 is an electric transmission substation in Montana, operated by AVISTA CORP. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorAVISTA CORP
Co-ownerBONNEVILLE POWER ADMINISTRATION
StateMontana
Coordinates47.5778, -114.6314

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#68479230 kVAVISTA CORP69.8 mi
#73725230 kVAVISTA CORP0.2 mi
#69486115 kVBONNEVILLE POWER ADMINISTRATION0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP204491, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP204491 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HOT SPRINGSSubstation-AdjacentMTLake County500 kV1,000 MW1.1 yrs76.4
Greenfield (TAFT - HOT SPRINGS)GreenfieldMTSanders County500 kV1,000 MW1.1 yrs73.5
DIXONSubstation-AdjacentMTLake County230 kV300 MW1.1 yrs73.1
Greenfield (NOXON - HOT SPRINGS)GreenfieldMTSanders County230 kV300 MW1.1 yrs69.1
Greenfield (TAFT - HOT SPRINGS)GreenfieldMTSanders County500 kV1,000 MW1.1 yrs68.9
Greenfield (TAFT - HOT SPRINGS)GreenfieldMTSanders County500 kV1,000 MW1.1 yrs68.1
KERRSubstation-AdjacentMTLake County161 kV100 MW1.1 yrs67.9
Greenfield (TAFT - GARRISON)GreenfieldMTMineral County500 kV1,000 MW1.1 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.