TAP204455

Substation

Montana · MONTANA-DAKOTA UTILITIES CO

Max voltage
115
kV

TAP204455 is an electric transmission substation in Montana, operated by MONTANA-DAKOTA UTILITIES CO. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorMONTANA-DAKOTA UTILITIES CO
StateMontana
Coordinates47.7507, -104.1825

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#69888115 kVMONTANA-DAKOTA UTILITIES CO5.3 mi
#69889115 kVMONTANA-DAKOTA UTILITIES CO8.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP204455, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP204455 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN204456Substation-AdjacentMTRichland County115 kV100 MW1.1 yrs69.7
Greenfield (UNKNOWN204458 - UNKNOWN204457)GreenfieldNDWilliams County230 kV300 MW1.1 yrs69.6
TAP160719Substation-AdjacentNDWilliams County115 kV100 MW1.4 yrs69.4
Greenfield (UNKNOWN204458 - UNKNOWN204457)GreenfieldNDWilliams County230 kV300 MW1.1 yrs69.0
UNKNOWN134177Substation-AdjacentNDWilliams County115 kV100 MW1.4 yrs69.0
LEWIS & CLARKSubstation-AdjacentMTRichland County115 kV100 MW1.1 yrs68.6
TAP204455Substation-AdjacentMTRichland County115 kV100 MW1.1 yrs68.2
UNKNOWN208336Substation-AdjacentMTRichland County115 kV100 MW1.1 yrs68.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP204455 substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.