TAP204145

Substation

Montana · GLACIER ELECTRIC COOP, INC

Max voltage
115
kV

TAP204145 is an electric transmission substation in Montana, operated by GLACIER ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGLACIER ELECTRIC COOP, INC
Co-ownerMARIAS RIVER ELECTRIC COOP INC
StateMontana
Coordinates48.5017, -111.8808

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#69303115 kVGLACIER ELECTRIC COOP, INC14.3 mi
#69304115 kVGLACIER ELECTRIC COOP, INC2.7 mi
#69597115 kVMARIAS RIVER ELECTRIC COOP INC0.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP204145, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP204145 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CONRADSubstation-AdjacentMTPondera County230 kV300 MW1.1 yrs73.4
UNKNOWN201552Substation-AdjacentMTPondera County230 kV300 MW1.1 yrs73.0
UNKNOWN206280Substation-AdjacentMTToole County230 kV300 MW1.1 yrs72.1
SHELBYSubstation-AdjacentMTToole County230 kV300 MW1.1 yrs71.4
UNKNOWN206279Substation-AdjacentMTToole County230 kV300 MW1.1 yrs69.8
UNKNOWN204627Substation-AdjacentMTPondera County115 kV100 MW1.1 yrs69.7
UNKNOWN206281Substation-AdjacentMTToole County230 kV300 MW1.1 yrs69.1
UNKNOWN202342Substation-AdjacentMTPondera County115 kV100 MW1.1 yrs68.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP204145 substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.