PLACID LAKE
SubstationMontana · MISSOULA ELECTRIC COOP, INC
PLACID LAKE is an electric transmission substation in Montana, operated by MISSOULA ELECTRIC COOP, INC. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #68476 | 230 kV | NORTHWESTERN ENERGY LLC - (MT) | — | 28.9 mi |
| #68477 | 230 kV | NORTHWESTERN ENERGY LLC - (MT) | — | 60.4 mi |
| #74585 | 138 kV | MISSOULA ELECTRIC COOP, INC | — | 9.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of PLACID LAKE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| RATTLESNAKE | Substation-Adjacent | MT | Missoula County | 230 kV | 300 MW | 1.1 yrs | 78.9 |
| UNKNOWN201810 | Substation-Adjacent | MT | Missoula County | 115 kV | 100 MW | 1.1 yrs | 75.8 |
| PLACID LAKE | Substation-Adjacent | MT | Missoula County | 230 kV | 300 MW | 1.1 yrs | 71.7 |
| CLINTON | Substation-Adjacent | MT | Missoula County | 115 kV | 100 MW | 1.1 yrs | 71.3 |
| Greenfield (GARRISON - RATTLESNAKE) | Greenfield | MT | Missoula County | 230 kV | 300 MW | 1.1 yrs | 70.8 |
| TAP207811 | Substation-Adjacent | MT | Missoula County | 115 kV | 100 MW | 1.1 yrs | 70.2 |
| Greenfield (RATTLESNAKE - MILL CREEK GENER) | Greenfield | MT | Missoula County | 230 kV | 300 MW | 1.1 yrs | 69.0 |
| Greenfield (UNKNOWN204159 - MILL CREEK GEN) | Greenfield | MT | Missoula County | 115 kV | 100 MW | 1.1 yrs | 67.7 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for PLACID LAKE substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.