NOXON RAPIDS

Substation

Montana · AVISTA CORP

Max voltage
230
kV

NOXON RAPIDS is an electric transmission substation in Montana, operated by AVISTA CORP. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorAVISTA CORP
StateMontana
Coordinates47.9606, -115.7338

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73456230 kVAVISTA CORP0.3 mi
#73457230 kVAVISTA CORP0.2 mi
#73458230 kVAVISTA CORP0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NOXON RAPIDS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NOXON RAPIDS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NOXONSubstation-AdjacentMTSanders County230 kV300 MW1.1 yrs73.0
Greenfield (TAFT - HOT SPRINGS)GreenfieldMTSanders County500 kV1,000 MW1.1 yrs70.5
Greenfield (NOXON - HOT SPRINGS)GreenfieldMTSanders County230 kV300 MW1.1 yrs68.2
Greenfield (LANCASTER - NOXON)GreenfieldMTSanders County230 kV300 MW1.1 yrs67.8
Greenfield (NOXON - CABINET GORGE)GreenfieldMTSanders County230 kV300 MW1.1 yrs67.8
Greenfield (NOXON - HOT SPRINGS)GreenfieldMTSanders County230 kV300 MW1.1 yrs67.3
Greenfield (NOXON - HOT SPRINGS)GreenfieldMTSanders County230 kV300 MW1.1 yrs67.2
Greenfield (NOXON - HOT SPRINGS)GreenfieldMTSanders County230 kV300 MW1.1 yrs67.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NOXON RAPIDS substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.