NATURENER GLACIER WIND ENERGY 2

Substation

Montana · GLACIER ELECTRIC COOP, INC

Max voltage
115
kV

NATURENER GLACIER WIND ENERGY 2 is an electric transmission substation in Montana, operated by GLACIER ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorGLACIER ELECTRIC COOP, INC
StateMontana
Coordinates48.5302, -112.1922

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73308115 kVGLACIER ELECTRIC COOP, INC1.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NATURENER GLACIER WIND ENERGY 2, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NATURENER GLACIER WIND ENERGY 2 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN201552Substation-AdjacentMTPondera County230 kV300 MW1.1 yrs73.0
UNKNOWN206280Substation-AdjacentMTToole County230 kV300 MW1.1 yrs72.1
SHELBYSubstation-AdjacentMTToole County230 kV300 MW1.1 yrs71.4
UNKNOWN202593Substation-AdjacentMTPondera County138 kV100 MW1.1 yrs71.0
UNKNOWN202594Substation-AdjacentMTPondera County138 kV100 MW1.1 yrs70.8
UNKNOWN206279Substation-AdjacentMTToole County230 kV300 MW1.1 yrs69.8
UNKNOWN204627Substation-AdjacentMTPondera County115 kV100 MW1.1 yrs69.7
UNKNOWN206281Substation-AdjacentMTToole County230 kV300 MW1.1 yrs69.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.