NATURENER GLACIER WIND ENERGY 1

Substation

Montana · NORTHWESTERN ENERGY LLC - (MT)

Max voltage
115
kV

NATURENER GLACIER WIND ENERGY 1 is an electric transmission substation in Montana, operated by NORTHWESTERN ENERGY LLC - (MT). It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorNORTHWESTERN ENERGY LLC - (MT)
StateMontana
Coordinates48.5096, -112.0999

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73304115 kVNORTHWESTERN ENERGY LLC - (MT)2.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NATURENER GLACIER WIND ENERGY 1, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NATURENER GLACIER WIND ENERGY 1 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CONRADSubstation-AdjacentMTPondera County230 kV300 MW1.1 yrs73.4
UNKNOWN201552Substation-AdjacentMTPondera County230 kV300 MW1.1 yrs73.0
UNKNOWN206280Substation-AdjacentMTToole County230 kV300 MW1.1 yrs72.1
SHELBYSubstation-AdjacentMTToole County230 kV300 MW1.1 yrs71.4
UNKNOWN202593Substation-AdjacentMTPondera County138 kV100 MW1.1 yrs71.0
UNKNOWN202594Substation-AdjacentMTPondera County138 kV100 MW1.1 yrs70.8
UNKNOWN206279Substation-AdjacentMTToole County230 kV300 MW1.1 yrs69.8
UNKNOWN204627Substation-AdjacentMTPondera County115 kV100 MW1.1 yrs69.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NATURENER GLACIER WIND ENERGY 1 substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.