JUDITH GAP WIND FARM
SubstationMontana · NORTHWESTERN ENERGY LLC - (MT)
JUDITH GAP WIND FARM is an electric transmission substation in Montana, operated by NORTHWESTERN ENERGY LLC - (MT). It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #68462 | 230 kV | NORTHWESTERN ENERGY LLC - (MT) | — | 58.0 mi |
| #68463 | 230 kV | NORTHWESTERN ENERGY LLC - (MT) | — | 7.8 mi |
| #73286 | 230 kV | NORTHWESTERN ENERGY LLC - (MT) | — | 1.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of JUDITH GAP WIND FARM, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| JUDITH GAP WIND ENERGY CENTER | Substation-Adjacent | MT | Wheatland County | 230 kV | 300 MW | 1.1 yrs | 74.5 |
| JUDITH GAP | Substation-Adjacent | MT | Wheatland County | 230 kV | 300 MW | 1.1 yrs | 74.3 |
| JUDITH GAP WIND FARM | Substation-Adjacent | MT | Wheatland County | 230 kV | 300 MW | 1.1 yrs | 74.3 |
| Greenfield (BROADVIEW - GARRISON) | Greenfield | MT | Wheatland County | 500 kV | 1,000 MW | 1.1 yrs | 71.2 |
| Greenfield (BROADVIEW - GARRISON) | Greenfield | MT | Wheatland County | 500 kV | 1,000 MW | 1.1 yrs | 70.9 |
| Greenfield (BROADVIEW - GARRISON) | Greenfield | MT | Wheatland County | 500 kV | 1,000 MW | 1.1 yrs | 70.5 |
| TAP205596 | Substation-Adjacent | MT | Wheatland County | 115 kV | 100 MW | 1.1 yrs | 69.9 |
| Greenfield (JUDITH GAP - UNKNOWN206326) | Greenfield | MT | Wheatland County | 230 kV | 300 MW | 1.1 yrs | 68.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for JUDITH GAP WIND FARM substation, Montana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.