TAP144804

Substation

Mississippi · MISSISSIPPI POWER CO

Max voltage
161
kV

TAP144804 is an electric transmission substation in Mississippi, operated by MISSISSIPPI POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorMISSISSIPPI POWER CO
Coordinates32.5544, -88.6029

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#39222161 kVMISSISSIPPI POWER COIN SERVICE0.8 mi
#44139161 kVMISSISSIPPI POWER COIN SERVICE7.5 mi
#49155161 kVMISSISSIPPI POWER COIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP144804, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP144804 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GREENE COUNTY STATIONSubstation-AdjacentMSLauderdale County230 kV300 MW1.4 yrs70.3
UNKNOWN156972Substation-AdjacentMSLauderdale County230 kV300 MW1.4 yrs69.8
SWEATTSubstation-AdjacentMSClarke County230 kV300 MW1.4 yrs69.5
SWEATTSubstation-AdjacentMSLauderdale County230 kV300 MW1.4 yrs69.0
UNKNOWN109380Substation-AdjacentMSKemper County161 kV100 MW1.4 yrs68.2
RATCLIFFESubstation-AdjacentMSKemper County230 kV300 MW1.4 yrs67.3
UNKNOWN109384Substation-AdjacentMSKemper County161 kV100 MW1.4 yrs67.0
UNKNOWN156971Substation-AdjacentMSLauderdale County230 kV300 MW1.4 yrs66.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP144804 substation, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.