TAP144772

Substation

Mississippi · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP144772 is an electric transmission substation in Mississippi, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates33.9702, -88.2508

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#28729161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE12.6 mi
#39277161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE31.9 mi
#49899161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP144772, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP144772 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CALEDONIASubstation-AdjacentALLamar County500 kV1,000 MW1.4 yrs77.0
WESTPOINTSubstation-AdjacentMSClay County500 kV1,000 MW1.4 yrs76.0
BROWNS FERRYSubstation-AdjacentALMarion County500 kV1,000 MW1.4 yrs73.6
LOWNDESSubstation-AdjacentMSLowndes County500 kV1,000 MW1.4 yrs73.5
Greenfield (WESTPOINT - LOWNDES)GreenfieldMSClay County500 kV1,000 MW1.4 yrs71.7
WEST VERNONSubstation-AdjacentALLamar County500 kV1,000 MW1.4 yrs69.7
Greenfield (UNKNOWN109244 - WEST VERNON)GreenfieldALLamar County500 kV1,000 MW1.4 yrs69.5
Greenfield (WESTPOINT - BROWNS FERRY)GreenfieldALMarion County500 kV1,000 MW1.4 yrs68.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP144772 substation, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.