TAP144746

Substation

Mississippi · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP144746 is an electric transmission substation in Mississippi, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates32.7989, -88.5491

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4030161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE8.5 mi
#13451161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.1 mi
#13452161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE4.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP144746, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP144746 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN156972Substation-AdjacentMSLauderdale County230 kV300 MW1.4 yrs69.8
SHUQUALAKSubstation-AdjacentMSNoxubee County161 kV100 MW1.4 yrs68.5
UNKNOWN109380Substation-AdjacentMSKemper County161 kV100 MW1.4 yrs68.2
TAP144790Substation-AdjacentMSNoxubee County161 kV100 MW1.4 yrs67.7
MACONSubstation-AdjacentMSNoxubee County161 kV100 MW1.4 yrs67.3
RATCLIFFESubstation-AdjacentMSKemper County230 kV300 MW1.4 yrs67.3
UNKNOWN109384Substation-AdjacentMSKemper County161 kV100 MW1.4 yrs67.0
UNKNOWN109640Substation-AdjacentMSLauderdale County230 kV300 MW1.4 yrs66.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.